National Electrical & EV Charging Infrastructure

Design. Build. Deliver.

In-house engineers and self-performing crews, from the first drawing to energized handoff.

Faith Energy

Electrical infrastructure work should feel coordinated before anyone mobilizes.

Electrical infrastructure gets expensive when planning, utility assumptions, field work, and handoff drift apart. Faith Energy keeps those decisions connected from the first review through handoff.

Two Faith Energy crew members in hard hats and high-visibility vests coordinating at an active construction site
Faith Energy field crew — coordination before mobilization
Plan Make the constraints visible before work starts.

Scope, schedule, site access, existing gear, drawings, and owner goals are aligned before the plan hardens.

What We Do

Three disciplines. One accountable team.

Commercial electrical, EV charging infrastructure, and the equipment, software, and service that keep it running — designed, built, and supported by the same people.

Project Control

Every hard decision lives somewhere on the one-line.

This is the drawing our engineers actually work from. Choose the decision creating risk on your project — the system shows where it sits in the power path, what breaks if it stays vague, and the move we drive before work proceeds.

Capacity Capacity is verified before design freeze.

Main service, transformer path, panel capacity, and growth assumptions stay tied to the operating plan before drawings or equipment decisions are treated as final.

SITE MODEL · SINGLE-LINE DIAGRAM Capacity review
DecisionConfirm available capacity

Measure the actual electrical headroom against current site operations and future charging growth.

RiskAvoid redesign after scope lock

If load assumptions are wrong, drawings, equipment, utility requests, and budget can all move at once.

Next actionSet the operating baseline

Capture service data, demand assumptions, growth phase, and owner priorities before committing the path.

Genesis of Montgomery dealership exterior in daylight — Mullinax Genesis electrical and EV charging project

Featured Project

Mullinax Genesis, Montgomery, Alabama

400 kW of ChargePoint Express DC fast charging — four 62.5 kW dispensers, power cabinets, LED site lighting, and the dealership’s electrical infrastructure, designed and built by Faith Energy.

See the project
Genesis-branded ChargePoint Express DC fast charger at Mullinax Genesis in Montgomery, Alabama, beside the highway Genesis of Montgomery showroom at dusk with site lighting energized

Real Projects

National work, photographed on our own jobs.

Hyundai dealership showroom with new customer parking and DC fast charging installed by Faith Energy
Hyundai dealershipCustomer-facing ChargePoint Express DC fast charging
Faith Energy field team setting electrical gear at HMart in Austin, Texas
HMart · Austin, TexasRetail electrical infrastructure and service gear
Delray Medical Center EV charging installation in Florida
Delray Medical Center · Delray Beach, FloridaEV charging inside an active hospital campus
Bluff Creek Coffee EV charging installation in Minneola, Kansas
Bluff Creek Coffee · Minneola, KansasDestination DC fast charging on a rural corridor
Capital Volvo dealership project in Tallahassee, Florida
Capital Volvo · Tallahassee, FloridaDealership infrastructure and EV readiness
Faith Energy technician beside an EV charger in an operating dealership service bay
Dealership service bayCharging inside an operating service department
See all projects

For Investors

Deploying capital into DC fast charging? Partner with the team that builds it.

Investors, infrastructure funds, and family offices bring the capital; Faith Energy brings site selection, port and kW sizing, incentives, bankable hardware, design-build construction, and uptime — so you own a charging network that performs.

Explore investor partnerships

Markets

Built for facilities where downtime costs real money.

Hover or tap a market to see what we build there.

Genesis of Montgomery dealership exterior in daylight — Mullinax Genesis electrical and EV charging project
01

Automotive Dealerships

Service bays, showroom power, and customer DC fast charging around an operating store.

01 · What we build

Automotive Dealerships

  • OEM EV-readiness programs and DC fast charging
  • Service-bay power, lighting, and switchgear upgrades
  • Phased work that protects sales and service hours
Open dealership readiness
Row of DC fast chargers, power cabinets, and LED site lighting poles at Mullinax Genesis in Montgomery, Alabama
02

Fleets

Depot charging sized to routes, dwell windows, and the service the site can actually deliver.

02 · What we build

Fleets

  • Charging layouts tied to dispatch and dwell time
  • Managed load, utility timing, and phased build-out
  • Uptime programs for unattended depots
Open fleet electrification
Genesis-branded ChargePoint Express DC fast charger at Mullinax Genesis in Montgomery, Alabama, beside the highway
03

Parking & Retail

Public charging that fits ADA routes, visibility, billing, and property value.

03 · What we build

Parking & Retail

  • Public Level 2 and DC fast charging programs
  • Zero-capex own-and-operate options
  • Signage, lighting, access control, and payments
Open parking and retail programs
Faith Energy electricians measuring conduit placement in a trench on a construction site
04

Workplace

Managed charging for employees and visitors with capacity for the next phase.

04 · What we build

Workplace

  • Tenant-improvement electrical and life safety
  • Managed charging with access policy and reporting
  • Conduit and capacity provisioned for growth
Open workplace and campus

How We Work

Four steps from first review to energized handoff.

Capacity, utility path, civil route, operating model, lead times, and inspection requirements are confirmed before equipment is ordered.

  1. 01Feasibility

    Site goals, capacity, access, utility constraints, and operating requirements.

  2. 02Design & Utility

    Drawings, service path, equipment strategy, permitting inputs, and phasing.

  3. 03Build

    Self-performed installation, coordination, inspections, and practical site control.

  4. 04Commission

    Testing, documentation, training, and operator handoff.

People

Powered by people who believe in excellence.

In-house engineers, licensed electricians, and self-performing crews — with safety planned before the jobsite gets busy. Faith Energy hires electricians, foremen, project managers, and estimators who want disciplined work and a practical path to growth.

Faith Energy crew member in a branded safety vest walking a building under construction Faith Energy team member in a branded hard hat and safety vest on site Faith Energy electrician carrying tools along a covered walkway on a construction site

FAQ

Practical answers before a project starts.

Open one question at a time for a quick read while keeping the project-review path in view.

What types of projects does Faith Energy take on?

Faith Energy supports DC fast charging deployments, building load management, demand response, Battery Energy Storage Systems, electrical building infrastructure, EV charging installations, fleet electrification, service upgrades, lighting, life safety, tenant improvements, and design-build electrical scopes for owners, general contractors, developers, and enterprise clients.

Can Faith Energy help before drawings or permits are complete?

Yes. Early involvement is often where the team can add the most value by reviewing site capacity, utility constraints, charger or equipment strategy, rough order budgets, phasing, and constructability before the project is locked in.

Do you handle both design and installation?

Faith Energy is built around design-build delivery. The team can coordinate engineering, planning, procurement guidance, field installation, commissioning, and closeout so owners have one accountable electrical partner.

How do you approach EV charging projects?

The process starts with usage goals, vehicle or customer demand, site electrical capacity, utility requirements, charger selection, software needs, installation phasing, and operating costs. That keeps the infrastructure aligned with the business case, not just the equipment list.

Can you support multi-site or multi-state programs?

Yes. Faith Energy supports commercial and enterprise programs that need repeatable standards, consistent communication, and coordinated execution across multiple locations.

What information helps start a project review?

A site address, target timeline, electrical drawings if available, utility account details, charger or equipment goals, photos of existing gear, and any known constraints are helpful. If some of that is missing, Faith Energy can still begin with a preliminary conversation.

Does Faith Energy help with equipment selection?

Yes. The team can advise on charger hardware, electrical gear, software integration needs, serviceability, lead times, installation requirements, and how equipment choices affect budget and operations.

How does Faith Energy reduce project risk?

The model connects planning, utility coordination, equipment strategy, field execution, commissioning, and handoff. That reduces gaps between consultants, suppliers, installers, and the owner’s operational goals.

Contact

Ready to plan a project?

Share the site, scope, timeline, and any utility constraints. Faith Energy can help shape the path from initial review to energized delivery.

Headquartered at 2163 Main St, Sarasota, FL 34237 · Texas and California operations · National project delivery
Email usStart project review