What We Do

Electrical services that move projects from idea to energized infrastructure.

Use Faith Energy when design, utility coordination, equipment planning, and field execution need to work as one system.

Faith Energy electricians measuring conduit placement in a trench on a construction site

Design-build

Design-build electrical, one accountable party

Owners, developers, and general contractors use Faith Energy to connect design intent with field reality — so the party that drew the work is the party that builds and answers for it.

  • Early site review, load planning, and utility coordination
  • Drawings, procurement, and installation sequencing from one team
  • Inspections, commissioning, and closeout documented for the operator
Review a design-build scope
Two ChargePoint Express Power Blocks — the DC fast charging power cabinets Faith Energy installed at Mullinax Genesis

Commercial electrical

Power distribution for facilities that can’t stop

Service upgrades, panels, feeders, lighting, controls, and life safety for operating buildings — sequenced around the hours the facility is open.

  • Switchgear, service entrances, and distribution upgrades
  • Lighting, controls, and life-safety systems
  • Equipment circuits and tenant build-outs
See commercial markets
Close-up of ChargePoint power cabinet louvers at a DC fast charging site

Energy management

Capacity decisions before money is committed

Load profiles, building load management, demand response, charger demand, and battery storage reviewed against the service that actually exists — and the upgrade timeline if it doesn’t.

  • Load studies and capacity headroom
  • Rate-aware load management and demand response
  • Battery energy storage sized to the operating goal
Plan load management
Row of DC fast chargers, power cabinets, and LED site lighting poles at Mullinax Genesis in Montgomery, Alabama

Fleet electrification

Depots built around dispatch reality

Charging strategy tied to route windows, dwell time, depot circulation, service capacity, and a construction sequence the operation can survive.

  • Charging windows and managed load modeled first
  • Utility timing and phased construction
  • Uptime programs for unattended depots
Review fleet delivery
Close-up of a ChargePoint DC fast charging connector seated in a white electric vehicle

Charging equipment

The right hardware for the site, not the brochure

Authorized reseller and certified installer for 15 brands and four charge-management platforms — narrowed by use case, access model, serviceability, and installation method.

  • Level 2 and DC fast charging across 60+ products
  • Software, payments, and load management matched to operations
  • Lead times and serviceability checked before ordering
Review charging equipment
Two Faith Energy crew members in hard hats and high-visibility vests coordinating at an active construction site

Consultation

Bring us in before the expensive decisions

The best time to involve Faith Energy is before drawings, equipment orders, and utility assumptions are locked — when service limits, civil paths, and switchgear lead times can still change the plan.

  • Feasibility and rough-order budgets
  • Switchgear and transformer lead-time sequencing
  • Permit, inspection, and handoff risks surfaced early
Start early consultation

Scope Library

Specific electrical scopes to define early.

Common scopes are easier to price and schedule when capacity, utility requirements, field conditions, and closeout expectations are defined early. Choose a scope to see what we define first.

Genesis-branded ChargePoint Express DC fast charger at Mullinax Genesis in Montgomery, Alabama, beside the highway

Scope 01

DC fast charging deployments

Power path, switchgear, utility timing, civil route, hardware selection, commissioning, uptime, and service access planned together.

  • Service capacity and transformer path confirmed first
  • Switchgear and power cabinets ordered against lead times
  • Commissioning and 24/7 service built into the handoff
EV charging infrastructure

Buyer Questions

Direct answers for owners, GCs, and enterprise teams.

When should Faith Energy be brought into a project?

Bring Faith Energy in before drawings, charger orders, utility assumptions, or schedule commitments are final. Early review helps expose capacity, phasing, utility, equipment, and inspection risks while there is still time to adjust.

Can Faith Energy support both commercial electrical and EV charging?

Yes. Faith Energy connects commercial electrical infrastructure with EV charging requirements, which is useful when a site needs service upgrades, distribution work, lighting, controls, charging hardware, software setup, and commissioning.

What makes design-build different for electrical work?

Design-build keeps planning, engineering coordination, procurement, and field execution connected. That reduces gaps between design assumptions and site realities, especially on infrastructure projects with utility, equipment, and schedule risk.

How Faith Energy Helps

Built for the decisions that usually slow electrical projects down.

  1. 01

    Site intelligence

    Capacity, access, utility constraints, phasing, and operating needs reviewed before decisions harden.

  2. 02

    Equipment strategy

    Hardware, switchgear, software, lead times, and installation requirements aligned with the budget.

  3. 03

    Field readiness

    Constructible scopes, crew planning, inspections, and schedule communication coordinated early.

  4. 04

    Operational handoff

    Commissioning, closeout documentation, and support for the people operating the system.

The Full Trade

Capabilities with their own dedicated teams — and pages.

Faith Energy is a full-scope electrical contractor. These are the disciplines we self-perform nationally, each covered in depth.

Site lighting

Parking and area lighting, photometric design, LED retrofits, and lighting controls — engineered for uniformity, code, and operating cost.

Site lighting services

Switchgear & distribution

Switchgear and switchboard installation, replacement, and upgrades; service entrances; distribution equipment; testing and commissioning.

Switchgear & distribution

Critical power

Standby generators, transfer switches, UPS, and paralleling gear — designed, installed, and tested to NFPA 110 by one party.

Critical power systems

Professional services

In-house design and engineering, technical plan review, power system studies, utility applications, commissioning, and closeout.

Professional services

Charge management software

CMS selection and deployment across networks — payments, access control, load management, and reporting matched to your operating model.

Charging software

EV charger service & maintenance

Preventative maintenance, repair, and uptime programs for nearly any major charger brand — from single sites to national portfolios.

Service & maintenance

Own & operate charging

Zero-capex charging for real estate: we fund, build, own, and operate the chargers on your property. You provide the parking; we provide everything else.

Own & operate

Building load management

Demand-charge reduction and capacity headroom via intelligent load control — the platform, the metering, and the field work from one team.

Load management

Next Step

Have a site, scope, or rollout to evaluate?

Start a project review
Email usStart project review