EV Charging Infrastructure

Charging programs built around power, uptime, and real site conditions.

Planned, built, commissioned, and supported by one team — for commercial sites where the electrical path matters as much as the charger brand.

Delivery Standard

EV charging succeeds when equipment, utility, construction, and software decisions stay connected.

Customers do not need a charger list first. They need to know what the site can support, what utility work is required, how the charging use case affects the electrical design, and how the system will be commissioned after installation.

CapacityExisting service, utility path, load profile, and future growth.
DeploymentDrawings, trenching, switchgear, permitting, installation, and schedule control.
HandoffCommissioning, network setup, testing, training, and operational handoff.

Plan / Build / Manage

Make the full EV charging business function visible.

Future-ready charging programs need more than hardware and installation. Faith Energy connects planning, infrastructure, integration, software setup, training, inspections, and maintenance into one commercial path.

Planning

Use case and feasibility

Industry goals, charger demand, vehicle dwell time, site capacity, incentives, budget, and utility timing.

Infrastructure

Power and equipment path

Electrical gear, conduit, trenching, mounting, charger selection, networking, and commissioning requirements.

Interface

Connected operation

Access controls, payment logic, load management, reporting, status visibility, and operator handoff.

Inspection

Support after go-live

Training, inspection rhythm, service response, maintenance planning, warranty notes, and site improvement loop.

Level 2 + DCFCWorkplace, fleet, public, dealership, and destination charging.
Utility-first planningCapacity, transformer path, metering, lead times, and service upgrades.
Network readinessEquipment, software, connectivity, charger testing, and operator handoff.

Scope of Work

One accountable team across the charging stack.

Utility path, service, distribution, chargers, network, and handoff are one electrical program. Choose a layer to see what we do there — and what it costs when it’s treated as somebody else’s job.

Utility The utility sets the schedule before anyone else does.

Service capacity, transformer availability, metering, and interconnection timing are confirmed first — because a 52–80 week transformer lead time outlasts every other decision on the project.

How we plan the utility path
CHARGING STACK · SINGLE-LINEUtility path
Faith EnergyWhat we do here

Capacity screens, utility applications, and transformer and service-upgrade coordination as a deliverable with dates.

RiskWhat goes wrong when it's skipped

Chargers arrive and sit boxed for a year waiting on a service upgrade nobody started.

Where EV Charging Creates Value

Programs for sites where charging is now part of the business plan.

Hover or tap a market to see what we build there.

Hyundai dealership showroom with new customer parking and DC fast charging installed by Faith Energy
01

Automotive Dealerships

OEM readiness, service-bay power, and customer DC fast charging around an operating store.

01 · What we build

Automotive Dealerships

  • DCFC sized to OEM programs and customer dwell
  • Service-bay power and showroom infrastructure
  • Utility timelines managed around sales hours
Open dealership readiness
Row of DC fast chargers, power cabinets, and LED site lighting poles at Mullinax Genesis in Montgomery, Alabama
02

Fleet Depots

Charging layouts, load planning, and phasing for vehicles that need dependable uptime.

02 · What we build

Fleet Depots

  • Dwell windows and route reliability modeled first
  • Managed charging and utility upgrades phased
  • Backup plans and 24/7 service for the depot
Open fleet electrification
Genesis-branded ChargePoint Express DC fast charger at Mullinax Genesis in Montgomery, Alabama, beside the highway
03

Parking, Retail & Multifamily

Resident, customer, and public charging aligned with access, billing, and property value.

03 · What we build

Parking, Retail & Multifamily

  • Public or private access and payment rules
  • ADA routes, lighting, signage, vandal resistance
  • Zero-capex own-and-operate where it pencils
Open property charging
Faith Energy electricians measuring conduit placement in a trench on a construction site
04

Workplace & Campus

Employee, visitor, and managed charging for offices, campuses, and mixed-use properties.

04 · What we build

Workplace & Campus

  • Access policy, reporting, and visitor use planned together
  • Network controls and load management
  • Capacity provisioned for expansion
Open workplace and campus

Charging Stations Support

Equipment selection only works after the site logic is clear.

Faith Energy helps match charger hardware and software to the electrical capacity, user model, uptime requirements, communications path, payment or access controls, serviceability, utility schedule, and installation budget.

Review charger requirements

Level 2 charging

Workplace, dealership, multifamily, parking, customer, employee, and overnight fleet charging where dwell time supports lower power.

DC fast charging

Higher-power infrastructure for public charging, retail, dealership, fleet, corridor, and high-throughput commercial use cases.

Network readiness

Connectivity, software setup, load management, reporting, access controls, payments, testing, and operator handoff.

Find Your Charger

Answer five questions. We’ll shortlist the right equipment.

Pick one answer in each step. Dwell time sets the charging class, port count sets the demand, your electrical service sets what fits without a utility project, and funding rules trim the list. Your picks appear as soon as all five are answered.

EV Buyer Questions

Decisions to settle before equipment is ordered.

How do you choose between Level 2 and DC fast charging?

Level 2 charging fits longer dwell times such as workplace, multifamily, dealership, parking, and overnight fleet use. DC fast charging fits higher-throughput use cases where vehicles or customers need shorter sessions, but it usually requires more utility and electrical planning.

How many EV chargers does a site need?

Charger count should be based on vehicle count, dwell time, customer demand, parking layout, utility capacity, power level, load management, expansion goals, and the business case for the site.

What should be reviewed before installation?

Review electrical capacity, utility timeline, charger placement, ADA routes, access control, payment model, network connectivity, load management, signage, lighting, commissioning, software setup, and operator handoff.

Does the work include network setup?

EV charging delivery should include network readiness, connectivity checks, software setup, access or payment logic, reporting, charger testing, commissioning, and operational handoff.

Turnkey Delivery Path

From early feasibility to energized chargers.

01

Site Feasibility

Review usage goals, parking layout, service capacity, utility constraints, civil path, communications, and budget risk.

02

Design & Utility

Coordinate drawings, load calculations, equipment requirements, service upgrades, metering, permitting, and phasing.

03

Build & Commission

Install electrical infrastructure, chargers, panels, conduit, trenching, controls, inspections, testing, and commissioning.

04

Commission & Handoff

Support software setup, charger networking, payment or access logic, closeout documentation, training, and operator readiness.

What Faith Energy Solves Early

Before the purchase order, confirm the power path.

EV charging projects get expensive when capacity, utility timing, software needs, charger selection, and field work are treated as separate decisions. Faith Energy keeps those decisions tied to constructability and handoff from the start.

Service capacityCan the existing electrical system support the business case?
Utility lead timeWhat needs coordination before drawings, permits, or equipment orders?
Charging use caseFleet uptime, customer access, public charging, or employee amenity?
Software modelAccess control, payments, reporting, load management, and serviceability.

Equipment Ecosystem

Hardware and software decisions matched to the site.

Faith Energy is an authorized reseller and certified installer across the major charging brands. Final equipment selection follows capacity, user experience, serviceability, software, and budget — not a logo.

ChargePoint
ABB
AmpUp
EV Connect
Tesla
Autel
Wallbox
FLO
BTC Power

Where Charging Goes Next

The two frontiers we’re engineering now.

Autonomous fleet depots

Robotaxi fleets charge at multi-megawatt depots — and the interconnection, switchgear, and permits that gate every city launch are electrical-contractor scope. How the fleets actually charge in 2026, and what to build now for the automation that’s coming.

Autonomous vehicle charging

Airport & rideshare hubs

Airport staging lots are the highest-utilization charging real estate in any metro, and almost every airport built the wrong charger in the wrong lot. The deployment tracker, the economics, and the zero-capex path for airports and nearby property owners.

Airport & rideshare charging

EV Project Review