
Fleet Electrification · School Buses
Districts and contractors take delivery of electric buses on grant timelines. The yard has to be ready the same day. Faith Energy designs and builds the electrical path, from the utility application to the last pedestal, and hands the transportation director a yard that charges itself overnight.
What the Bus Needs
A school bus parks for ten hours and drives for two. That dwell window is the whole design advantage: slow, managed, cheap charging does the job for most of the fleet, and DC fast charging is reserved for the buses that run mid-day.
| Bus type | Typical battery | Typical route-day energy | Depot charging we specify |
|---|---|---|---|
| Type A (small, van-chassis) | 90–130 kWh | 30–70 kWh | Level 2, 11.5–19.2 kW, managed |
| Type C (conventional) | 150–230 kWh | 60–130 kWh | Level 2, 19.2 kW, managed; DC 30–60 kW for mid-day routes |
| Type D (transit-style) | 200–315 kWh | 80–160 kWh | Level 2, 19.2 kW overnight plus shared DC 60–150 kW positions |
| Activity and field-trip buses | As above | Can exceed 200 kWh | DC fast position reserved by schedule |
Planning-level ranges across current manufacturers and typical routes of 40–90 miles a day. We size the final design from your route sheets and the buses you are actually buying.
What the Yard Needs
Twenty buses at 19.2 kW unmanaged is about 384 kW; managed overnight it averages closer to 200 kW. Ten to twenty buses commonly fit an existing 480 V service with a new feeder and panel. Fifty buses, or any meaningful DC fast charging, usually means a new utility service and a transformer on order. We run the capacity screen and the utility application first, because they take the longest.
Level 2 at 19.2 kW for the overnight fleet, DC fast positions for mid-day buses, and pedestals rated for the yard (impact protection, cable management, cold or heat as your climate demands). Networked chargers with OCPP and managed charging are the difference between a yard that fits the service and one that does not. V2G-ready is a design choice, not a hardware purchase, until a utility program pays for it.
Pull-through versus back-in parking, cable reach to the charge port on the buses you are buying, bollards and curbs that survive a driver backing a 40-foot bus, drainage, snow storage, and lighting for 5 a.m. departures. Conduit sized for the full fleet goes in while the trench is open.
Clean School Bus awards, utility make-ready, and state programs each carry in-service deadlines. The utility timeline has to be confirmed before vehicle orders are placed, not after. We file the application, document make-ready scope the way the programs require, and keep the paperwork aligned with the construction schedule. Current programs by state.
Who We Work For
Some districts own the yard and the buses. Some contract transportation and the contractor owns the depot. Some bring in a charging-as-a-service partner who owns the chargers under a long-term agreement. In every model the electrical infrastructure is the same scope, and it is ours: in-house engineering, the utility application, self-performed construction, commissioning, and the operator handoff. We work alongside whoever owns the chargers, including partners who own and operate them on your behalf.
Talk to a depot engineerFrom the brands we are an authorized reseller and certified installer for. Final selection follows the buses, the service, and the funding program’s equipment rules.
Straight Answers
Next Step
Send us the bus count, the route sheets, and the yard address. Our engineers return the capacity screen, the utility path, a managed-charging design, and a construction schedule your delivery date can key off.