Row of DC fast chargers, power cabinets, and LED site lighting poles at Mullinax Genesis in Montgomery, Alabama

Fleet Electrification · Trucks, Buses, Vans

Depot charging for trucks, buses, and vans, built around the route.

Class 8 tractors, school and transit buses, and delivery vans each need a different depot. Faith Energy designs and builds the electrical infrastructure for all three, from the utility application and medium-voltage switchgear to managed Level 2, DC fast, and megawatt (MCS) positions, and hands your team a yard that is ready on delivery day.

Operating Benchmark

The benchmark is simple: every vehicle leaves with the right charge, from the right stall, inside the available dwell window.

That standard changes the work. Charger count is only one variable. Route miles, return time, reserve range, battery size, parking assignment, driver behavior, telematics data, maintenance access, and the utility path all have to agree before the site can operate reliably.

Route readyCharge targets by vehicle, shift, and duty cycle.
Depot readyPower, layout, communications, and protection.
Operator readySchedules, alerts, training, and service response.
Depot Readiness BoardTonight's dispatch window
Route A92%Target SOC by 5:15 AM
Route B78%Managed charge until off-peak
Spare pool6Vehicles held for service calls
Load managementActive below site peak threshold
Charger uptimeNetworked stations checked before pull-in
Exception handlingLow-SOC vehicles assigned priority stalls

What You Drive

Three fleets. Three different depots.

The battery decides the energy, the dwell window decides the power, and the vehicle class decides the connector. Start from the vehicles you are buying.

DC fast charging power cabinets at a Faith Energy site
Class 6–8 trucks

Megawatt depots for tractors, drayage, and straight trucks.

400–1,000 kWh batteries, CCS at 150–350 kW overnight, MCS up to 1.2 MW on route, and the 1–10 MW interconnection and switchgear that gate the opening date.

Electric truck depots
Row of DC fast chargers and LED site lighting at a Faith Energy charging site
School and transit buses

Yards that charge overnight and leave on time.

150–315 kWh school bus batteries on managed 19.2 kW Level 2, DC positions for mid-day routes, transit depots at 150 kW with overhead charging where the route needs it, and funding deadlines kept.

Electric school bus charging
Faith Energy electricians measuring conduit placement in a trench
Vans and service fleets

Level 2 depots sized to the dispatch window.

Light and medium-duty vans, service trucks, and loaner fleets on managed Level 2 with a few shared DC positions, phased as vehicles arrive, usually on the service the building already has.

Depot cost by vehicle type

Telematics / Charging / Infrastructure

The software layer can expose the operating problem. The depot still has to be built to solve it.

Modern fleet programs use telematics to understand route suitability, state of charge, departure timing, energy use, and vehicle readiness. Faith Energy turns those signals into the physical plan: service capacity, load management, charger placement, civil path, network readiness, commissioning, and the operator handoff.

01Vehicle suitability

Which vehicles can electrify based on route patterns, range confidence, dwell time, payload, and total cost assumptions.

02Charge scheduling

Which vehicles need priority by departure time, state of charge target, route criticality, and energy cost window.

03Depot buildout

Which service upgrades, panels, conduit routes, charger families, network paths, and phased installs make that plan real.

Depot Readiness Planner

Pressure-test the fleet before the charger layout gets expensive.

The question every depot has to answer first: can the site deliver enough managed charging inside the available dwell window without overwhelming the electrical service?

-- Adjust the model Use the controls to see whether the depot leans ready, constrained, or utility-limited.
Energy overnight--Total energy target for first-phase vehicles.
Effective charging need--Approximate kW required during the dwell window.
Charger pressure--Vehicles per active port before spares and exceptions.
Planning response

    Fleet Suitability

    Build the charging plan from the actual work your vehicles perform.

    01

    Route reliability

    Compare daily miles, route variance, payload, weather exposure, reserve range, and the cost of a missed dispatch.

    02

    Dwell windows

    Map when vehicles return, how long they sit, which stalls they use, and whether charging can be scheduled away from peak demand.

    03

    State of charge rules

    Set target SOC by vehicle class, route criticality, backup assignment, and the next day's work instead of charging everything blindly.

    04

    Depot capacity

    Review existing service, panel space, switchgear, transformer path, trenching, charger protection, lighting, and snowball effects from future phases.

    05

    Charge scheduling

    Use managed charging, access rules, and dispatch priorities to keep vehicles ready while controlling peak load and energy cost exposure.

    06

    Uptime response

    Plan network checks, charger status visibility, service access, spare capacity, and escalation rules before an outage affects routes.

    Delivery Path

    An accountable delivery path for depots that cannot afford guesswork.

    Fleet charging touches operations, facilities, finance, IT, utility coordination, and the field team. Faith Energy keeps those decisions connected from the first site walk through commissioning.

    1. 01Survey the depot

      Parking, traffic flow, maintenance zones, panel rooms, conduit routes, spare capacity, communications, and charger protection.

    2. 02Model power and phasing

      Immediate vehicles, future growth, transformer needs, load management, demand profile, and the utility upgrade timeline.

    3. 03Build and commission

      Permitting, trenching, conduit, panels, chargers, network setup, labeling, inspections, functional testing, and closeout.

    4. 04Train the operator

      Charging schedules, access rules, alerts, driver habits, service contacts, documentation, and go-live support.

    Charging Hubs

    We build private depots for fleets and the shared hubs fleets charge at on route.

    Charging operators and property owners are developing 5–10 MW truck charging hubs with CCS and MCS positions near freight corridors and intermodal yards. The electrical infrastructure is 70–90% of what those hubs cost, and it is the same scope as a private depot at larger scale: interconnection, medium-voltage switchgear and transformers, duct bank, power cabinets, lighting, and commissioning. Faith Energy performs that work for hub operators and for investors building a charging network, and services the equipment afterward across brands.

    How we build truck hubs

    Hardware we specify for fleet depots.

    From the brands we are an authorized reseller and certified installer for, matched to the dwell data rather than to a logo. Use the charger selector for a first shortlist.

    Fleet Site Review

    Bring the route plan, vehicle list, and depot constraints. Faith Energy will help turn them into a buildable charging program.

    A useful first review usually covers vehicle count, route miles, return times, parking layout, existing electrical gear, future fleet growth, charger preferences, uptime expectations, and utility timeline concerns.

    Fleet Electrification FAQ

    Answers for operators planning truck, bus, and van depots.

    What makes fleet charging different from ordinary commercial EV charging?

    Fleet charging has to protect dispatch reliability. The plan should account for route miles, dwell windows, state-of-charge targets, charger uptime, load management, parking assignment, utility capacity, and operator handoff.

    How much power does a truck depot need?

    Twenty Class 8 trucks need about 8 MWh a night. Charged all at once at 350 kW that is a 7 MW peak; managed over a 10-hour window it averages about 800 kW. Managed charging and shared power cabinets are what let a depot fit a 1–1.5 MW service instead of a substation feed. See the truck depot page for the class-by-class numbers.

    What is MCS and which fleets need it?

    The Megawatt Charging System is the heavy-duty connector standard that moves beyond the CCS ceiling; deployed hardware delivers about 1.2 MW per port. Fleets that must turn a Class 8 truck around mid-shift need it. Overnight depots for the same trucks run on CCS at 150–350 kW because the dwell window does the work.

    Level 2 or DC fast charging for school buses?

    Managed Level 2 at 19.2 kW for the overnight fleet, which is most of a district's buses, and DC positions at 30–150 kW for buses that run mid-day routes. Details on the school bus charging page.

    Does fleet electrification require telematics data?

    Telematics data is helpful because it can show route suitability, energy use, dwell windows, and exceptions. If telematics data is not available, Faith Energy can still begin with vehicle count, route assumptions, site layout, and operating schedules.

    When should a fleet consider managed charging?

    Managed charging should be considered when vehicles share limited site capacity, when demand charges matter, when departure times vary, or when the depot needs priority rules for critical routes and low-state-of-charge vehicles. For most depots it is the difference between the existing service and a utility upgrade.

    Can a depot open before the utility upgrade is finished?

    Often, in phases: managed charging on the existing service, a battery energy storage system to buffer DC fast positions, or battery-backed mobile DC chargers as a bridge. The utility application still goes in first because a new multi-megawatt service commonly takes 12–36 months.

    Who operates the depot after commissioning?

    Either your team with our training and documentation, or Faith Energy under a service and uptime agreement with monitoring, preventative maintenance, and repair across charger brands. Depots justify service contracts faster than any other site type because a down port is a parked route.