
The Faith Energy take
Pedestals, concrete mounting templates, cable management kits and connectivity gateways decide whether a site passes inspection and survives its first winter, so we quote them as part of a complete bill of materials rather than after the slab is poured. For the Express Solo and Power Block 2000 the mounting template and cable jig are not optional; they set the conduit stub-up and anchor pattern for a cabinet that cannot be shifted once the liquid-cooled cables are terminated. The legacy DC universal template reached end of sale in March 2026, so Express 250 and 280 projects now use the station-specific kits. Send us the drawing set and we will return the accessory list with part numbers.
Quotes include the complete bill of materials — equipment, make-ready assumptions, networking, and commissioning — reviewed by our engineers against your site.
Ask an engineer about this unit