< All equipment

Browse by Type

DC fast chargers, compared across every brand we install.

DC fast charging is an infrastructure decision before it’s a hardware decision — the switchgear, utility service, and site economics matter more than the faceplate. Every unit below is one we sell, install, and service.

Tick up to three products to compare their specifications side by side.

Straight Answers

How we’d choose, honestly.

What is the best commercial DC fast charger in 2026?
For high-utilization economics: Tesla's charging hardware leads on price-per-kW. For utility-grade fleet duty: ABB. For Buy America / NEVI-funded corridors: BTC Power or Lincoln Electric Velion. For integrated network experience: ChargePoint Express. For value with open networking: Autel's DC line. The right answer follows utilization, funding requirements, and service capacity — which is why Faith Energy carries all of them.
How much does a DC fast charger cost installed?
Budget $80,000–$150,000 installed for 60–100 kW units and $150,000–$400,000+ per stall at 150–400 kW, where dedicated transformers and switchgear enter the project. Multi-stall sites share infrastructure and improve per-stall economics significantly.
What power level of DC fast charging do I actually need?
Match power to dwell time: 50–100 kW suits 45–90 minute stops (retail, dealerships); 150–250 kW suits 20–40 minute corridor stops; 350 kW+ serves heavy-duty and future-proofed corridor sites. Oversizing power without the utility service to feed it is the most common DCFC specification error.

Want the shortlist for your site?

Operating model, power reality, budget, program requirements — give us those and the answer usually falls out. See also the installation cost guide and the brand comparison.

Request equipment guidance