EV Charging Incentives · California · EV Charge SF

EV Charge SF: up to $5,400 per charging stall for San Francisco buildings.

EV Charge SF is the San Francisco Public Utilities Commission's incentive program for EV charging in multifamily and commercial buildings. It pays $4,500 per Level 2 stall ($5,400 at 100% affordable housing), plus amounts for outlets, conduit, direct wiring and power sharing, up to $100,000 per site each year. Funding is first-come, first-served, and the order of operations matters: nothing can be purchased before SFPUC issues the reservation notice.

· Source: EV Charge SF Program Handbook, version October 26, 2026 · Status: Open: first-come, first-served

$4,500per Level 2 charger stall in existing market-rate multifamily and commercial buildings
$5,400per Level 2 stall at 100% affordable multifamily properties
$100,000annual cap per site ($120,000 for affordable housing; $500,000 for accounts using over 200 million kWh a year)
$0for SFPUC technical assistance on sites electrifying four or more stalls

At a Glance

EV Charge SF at a glance.

The essentials, summarized from the EV Charge SF Program Handbook, version October 26, 2026. Handbook sections are cited under each table below.

AdministratorSan Francisco Public Utilities Commission (SFPUC), Power Enterprise
Who qualifiesCleanPowerSF and Hetch Hetchy Power customers on a qualifying residential, commercial, industrial or enterprise municipal rate
Property typesMultifamily buildings with 5+ units (rental, condo, HOA), and non-residential buildings: workplace, fleet, retail, hotels, schools, garages, government facilities
Building statusExisting buildings, and new construction for one year after the building permit is finalized
Headline incentive$4,500 per Level 2 stall (75% cost cap); $5,400 at 100% affordable sites (100% cost cap)
Annual site cap$100,000 per site per 12 months; $120,000 for 100% affordable housing
Funding basisFirst-come, first-served; affordable housing prioritized once 90% of a year's funds are reserved
Hard ruleEquipment cannot be purchased before the Incentive Reservation Notice
Reservation window12 months for existing buildings; 24 months for new construction
ContractorWork must be performed by a California-licensed contractor
PaymentCheck mailed to the W-9 payee after SFPUC verification

Eligibility

Who qualifies for EV Charge SF.

Four tests decide eligibility. A building that fails any one of them cannot reserve funds, so we check all four before anything else.

Location

The property is in San Francisco, or is served by Hetch Hetchy Power outside the city.

Utility account

The account serving the chargers is on CleanPowerSF or Hetch Hetchy Power, on a qualifying rate. General Use Municipal rates (CG and IG schedules) do not qualify. New construction on temporary PG&E power can enroll if it commits to CleanPowerSF or Hetch Hetchy service before payment.

Property type

Multifamily with five or more units, where both shared and assigned stalls qualify, or any non-residential property. Commercial stalls do not have to be open to the public.

Beyond code

Only work above what code already requires is paid. San Francisco's EV Readiness Code and the Commercial Garage EV Charging Ordinance set the baseline, so a site's code obligations decide which stalls earn the larger amounts.

Not eligible

  • Single-family homes, duplexes, townhomes, and buildings with fewer than five units
  • Private garages that serve one unit, unless the area was on a common meter before the project
  • Curbside charging, transit and school bus charging, and public DC fast charging hubs
  • Replacing or upgrading existing chargers or fully wired EV circuits, working or not
  • Equipment purchased before the Incentive Reservation Notice date

Existing Buildings

What EV Charge SF pays per stall in existing buildings.

One incentive per stall, plus the direct-wiring and power-sharing adders, which stack on top. Each line is capped at a share of that project's cost, and the whole site is capped each year.

Property typeEquipmentIncentive per stallCost cap
Market-rate multifamilyLevel 2 charger$4,50075% of project cost
Market-rate multifamilyLevel 1 or Level 2 / LPL2 outlet$2,000100%
Market-rate multifamilyConduit for future charging$250100%
100% affordable multifamilyLevel 2 charger$5,400100%
100% affordable multifamilyLevel 1 or Level 2 / LPL2 outlet$2,400100%
100% affordable multifamilyConduit for future charging$300100%
Non-residentialLevel 2 charger$4,50075%
Non-residentialLevel 1 or Level 2 / LPL2 outlet$2,000100%
Non-residentialConduit for future charging$250100%
AllDirect wiring adder+$500—
AllPower sharing adder+$250—

Source: EV Charge SF Program Handbook, section 7.1 (version October 26, 2026). Stalls that already have charging equipment or fully wired EV circuits are not eligible. SFPUC will consider Level 3 (DC) chargers one-for-one in place of Level 2.

New Construction

New construction is paid only for going beyond the EV Readiness Code.

For new buildings the baseline is what the permit already requires. The program pays for upgrading a required stall to a full charger, and pays more for stalls the code does not touch.

Code baseline for the stallUpgradeMarket rate100% affordable
Required to have a 40 A circuit or 20 A circuit (LPL2), not a chargerLevel 2 charger$1,000$1,200
Not required to have any EV equipment or infrastructureLevel 2 charger$2,000$2,400
Not required to have a wired 20 A or 40 A circuitLevel 1 or Level 2 outlet$1,000$1,200
Not required to have a 40 A circuit or be EV capableEmpty conduit for a future branch circuit$250$300
Any stallDirect wiring adder+$500+$500
Any stallPower sharing adder+$250+$250

Source: Handbook section 7.1. New-construction incentives are capped at 100% of project cost. Direct wiring that code already requires is not eligible. New construction reservations stay valid for 24 months.

How the Money Actually Works

The program pays per stall. Electrical capacity decides how many stalls you get.

Most San Francisco garages were never wired for a charger at every stall, and a service upgrade can cost more than the chargers it feeds. The handbook expects this. It pays the full Level 2 amount for each stall on a shared circuit, and adds $250 per stall for power sharing. Designing around existing capacity is how a building qualifies more stalls without a new service.

Circuit sharing

Up to four Level 2 stalls on one 40 A circuit each earn the full Level 2 incentive, provided every stall has its own J1772 or J3400 connector.

Panel-level load management

Several chargers under automated load management, each on at least a 20 A circuit, each earn the full Level 2 incentive. Each connector must receive at least 1.4 kW while operating.

Outlets where dwell is long

At $2,000 per stall with a 100% cost cap, a Level 2 / LPL2 outlet can be the better fit for overnight residential parking. The handbook recommends the Level 2 outlet over Level 1 for commercial retail sites.

Direct wiring

Wiring a stall to the tenant's own unit panel moves charging onto that tenant's bill and adds $500 per stall. It is often the most practical option in older buildings that have no common-area capacity.

Illustration, not a quote. Take a 60-unit market-rate building that adds 16 networked Level 2 stalls, four per 40 A circuit, with power sharing. That is 16 × $4,500 + 16 × $250 = $76,000. The Level 2 portion is capped at 75% of its cost, and the site total is capped at $100,000 a year. SFPUC sets the actual amount in the Incentive Reservation Notice.

How to Apply

Six steps from enrollment to payment, in the order the program requires.

  1. Pre-enrollment

    Read the handbook and fact sheets on the SFPUC program page. We screen the site against the four eligibility tests and the code baseline first.

  2. Enrollment

    The applicant (owner, manager, HOA, or an eligible tenant) signs the Enrollment Agreement, attends an initial meeting with program staff, and views the Technical Orientation. An Authorized Agent such as your contractor can be designated to act for you.

  3. Scope and Incentive Agreement

    Submit the project scope: existing electrical system, existing chargers and EV-ready circuits, and the proposed stalls. Sites electrifying four or more stalls can request free SFPUC technical assistance.

  4. Incentive Reservation

    SFPUC approves the agreement and issues the Incentive Reservation Notice. Only then can equipment be purchased. The reservation lasts 12 months for existing buildings and 24 months for new construction.

  5. Build

    A California-licensed contractor installs new, listed equipment that meets the program rules. Networked chargers need a network agreement, an O&M contract and a vendor warranty of at least three years.

  6. Verify and get paid

    Notify the program at completion and submit verification within 45 days: itemized invoices with proof of payment, photos, serial numbers and labeled panels. SFPUC verifies, often on site, and mails a check to the W-9 payee.

Missing the reservation expiry without notifying SFPUC can cancel the Incentive Agreement. A 30-day extension for verification paperwork is available at SFPUC's discretion.

Equipment that meets the EV Charge SF rules.

Level 2 chargers must be hardwired, wall- or pedestal-mounted, UL (or equivalent) listed, use a J1772 or J3400 (NACS) connector, run on a dedicated 208/240 V circuit of at least 20 A delivering 3.3 kW or more, and be ENERGY STAR certified if networked. Charging software must use an open protocol such as OCPP. The owner must operate the equipment for at least three years. The program recommends ISO 15118 hardware but does not require it.

We confirm the current ENERGY STAR listing, connector and protocol for the exact model before the Incentive Agreement is signed. EV Charge SF is vendor-agnostic and does not endorse any brand.

Where a Contractor Fits

We handle the program paperwork along with the electrical work.

Faith Energy has a Sacramento office and in-house electrical engineers, and our California installations are performed by a licensed C-10 electrical contractor, as the program requires. On EV Charge SF projects we can act as your Authorized Agent. We screen the site, build the capacity plan that sets the stall count, prepare the scope and Incentive Agreement, release equipment orders only after the reservation notice, install, and assemble the verification package SFPUC checks against. You remain the applicant, and the incentive is paid to you or your designated payee.

EV Charge SF can be combined with other charging incentives, such as PG&E's Multifamily & Small Business EV Charger Program, unless SFPUC also funds the other program. You must tell the program about every other incentive. SFPUC then reduces its amount so total incentives never exceed 100% of project cost.

Screen my building for EV Charge SF

Straight Answers

EV Charge SF, answered plainly.

What is EV Charge SF?
EV Charge SF is an EV charging incentive program run by the San Francisco Public Utilities Commission (SFPUC). It pays CleanPowerSF and Hetch Hetchy Power customers to install EV chargers, outlets and charging infrastructure in multifamily buildings with five or more units and in non-residential buildings, in existing buildings and in new construction that goes beyond code. It also provides free technical assistance and educational resources.
How much does EV Charge SF pay per charger?
In existing buildings it pays $4,500 per Level 2 charger stall (market-rate multifamily and non-residential, capped at 75% of project cost) and $5,400 per stall at 100% affordable multifamily properties. Outlets pay $2,000 per stall ($2,400 affordable) and conduit for future charging $250 ($300). Direct wiring adds $500 per stall and power sharing adds $250. Total incentives are capped at $100,000 per site per year, or $120,000 for 100% affordable housing.
Who is eligible for EV Charge SF?
The property must be in San Francisco or served by Hetch Hetchy Power, and the account serving the chargers must be with CleanPowerSF or Hetch Hetchy Power on a qualifying rate. Multifamily properties need five or more units. Non-residential properties such as workplaces, fleets, retail, hotels, schools and parking garages qualify. Single-family homes, curbside charging, school bus and transit charging, and public DC fast charging hubs do not.
Do I need to be a CleanPowerSF customer?
Yes, or a Hetch Hetchy Power customer. The electric account serving the chargers must be on one of those services and a qualifying rate. New construction running on temporary PG&E construction power can enroll by committing to CleanPowerSF or Hetch Hetchy service, which must be in place before the incentive is paid.
Can a condo HOA or a tenant apply?
Yes. For existing buildings the applicant can be the property owner or manager, a homeowners' association, an individual condo owner, or a tenant who is an SFPUC electric customer. The Site Host must authorize the work. The applicant can designate an Authorized Agent, such as the contractor, to handle communication with the program.
Can I buy the chargers before applying?
No. Equipment purchased before the Incentive Reservation Notice is not eligible. The only exception in the current handbook covers equipment bought in the three months before the current program offering, and only if construction had not begun before the reservation notice. Sequence the purchase order after the reservation.
Can EV Charge SF be combined with other incentives?
Generally yes, for example with PG&E's Multifamily & Small Business EV Charger Program, unless SFPUC also funds the other program. You must tell the program about every other incentive, and SFPUC lowers its amount so that total incentives do not exceed 100% of project cost.
Does EV Charge SF pay for DC fast chargers?
Not as a separate category. Public DC fast charging hubs are not eligible. SFPUC may, at its discretion, accept a Level 3 (DC) charger one-for-one in place of a Level 2 charger at the Level 2 amount. The DC unit must meet CALeVIP, Communities in Charge or EnergIIZE technical requirements.
How long does an EV Charge SF reservation last?
Twelve months from the reservation notice for existing buildings and 24 months for new construction. After construction, the applicant has 45 days from notifying the program to submit verification documents, and SFPUC may grant a 30-day extension.
Who can install EV Charge SF projects?
Any contractor licensed by the State of California. Equipment must be new, listed, hardwired (for chargers), and installed to the California Electrical Code. Networked installations need a network agreement, an operations and maintenance contract, and a vendor warranty of at least three years.
How is the EV Charge SF incentive paid?
By check, mailed to the payee on the submitted IRS W-9. Payment follows SFPUC's verification, which reviews itemized invoices and proof of payment and usually includes an on-site inspection.

Next Step

Find out what your San Francisco building qualifies for.

Send us the address, the unit or stall count, a photo of the main panel nameplate and a recent CleanPowerSF or Hetch Hetchy bill. Our engineers will tell you whether the building qualifies, how many stalls existing capacity supports, and the incentive SFPUC is likely to reserve.

Email usStart project review